Notes:
10800 SQ FT CIFO / PRO FITNESS
10/25/2001 12:00:00 AM
1. All plumbing as per 1997 UPC
2. Project must be ADA/TAS Compliant
3. All underground piping shall be bedded with clean fill.
4. All underground piping shall be back filled with clean fill.
5. PVC 90 degree fitting or equalvalent sweeps are not permitted in the building drain or sewer.
6. All domestic water lines shall be copper.
7. Water Heater T & P lines may not discharge onto any flatwork. ( Sidewalk, loading dock, parking lot, etc.)
8. All domestic hot water piping shall be insulated.
9. All Floor drains shall have Trap Primers.
10. All back to back fixtures must be set with approved drainage fitting.