Notes:
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
11. BEAMS=10"W X 28"D.
47. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
52. "ENGINEER OF RECORD" LETTER MISSING OR INCOMPLETE
59. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
1780 AC, 2228 SQ FT, SFR / 1 STORY