Notes:
4661 AC, 5439 SQ FT, SFR / 2 STORY
10/6/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(10/6/2003 11:05 MBW)SECOND FLOOR WITH 4 BEDROOMS, 3 BATHROOMS, GAMEROOM.
GRADE BEAMS-10"WX34"D.
REMOVE YOUR FRAMING FROM FUTURE SUBMITTALS. INCLUDE ONLEY THE ENGINEER OF RECORD DRAWINGS.