Notes:
3076 AC, 3525 SQ FT, SFR / 2 STORY
10/23/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
53. PLANS MUST BE LEGIBLE OR 24" X 36".
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(10/23/2003 11:45 MBW)SEE APRIL 2003 GUIDELINE (PAGE 11) FOR ENGINEER OF RECORD REQUIREMENTS.
SECOND STORY SHEAR WALL(S) NOT SHOWN.