Notes:
2884 AC,3782 SQ FT,SFR/ 2 STORY
12/17/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(12/17/2003 14:31 MBW)PROVIDE EXPANSION JOINTS IN MASONRY FACADE.
(12/19/2003 16:43 DEB) CHANGED BUILIDNG PERMIT FEE FROM $1,573.75 TO $1,573.21.....BUILDER'S CHECK NOT ENOUGH