Notes:
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
59. WEBB FLOOR JOIST SYSTEMS AND ROOF TRUSS SYSTEMS MUST BE ENGINEERED (SEALED AND SIGNED AND APPROVED BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL FOR A BUILDING PERMIT.
(1/27/2004 08:41 SOM)SECOND FLOOR WITH (2) BEDROOM, (2) BATH AND GAMEROOM
4336 AC, 5385 SQ FT, SFR / 2 STORY