Notes:
2785 AC, 3261 SQ FT, SFR \ 1 STORY
3/12/2004 12:00:00 AM
ADDRESSED CHANGED.1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(3/18/2004 15:19 SOM)ALL FUTURE ENGINEERING DRAWINGS TO BE ON ENGINEERS TITLE BLOCK OR THEY MAY BE REJECTED