Notes:
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
(3/23/2004 08:49 SOM)
51. "ASCE" REQUIRES TOP AND / OR BOTTOM BEAM REBAR PER 5.2.2.3 d.
52. "J" GARAGE REQUIRES 28'0" FACE OF GARAGE TO SIDEYARD PROPERTY LINE.
53. ANY CHANGES FROM THE APPROVED PLAN ON FILE WITHOUT PRIOR AUTHORIZATION WILL VOID THIS PERMIT.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
55. ENGINEER OF RECORD FRAMING DESIGN SUPERSEDES BUILDERS DESIGN PLANS.
56. LETTERS OF ACCEPTANCE REQUIRED FROM BOTH ENGINEERS FOR CO.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BATTIER-FREE RAMP.
60. THIS SUBMITTAL NOT IN COMPLIANCE WITH APRIL 2003 CONTRACTOR GUIDELINES.
2525 AC, 3089 SQ FT, SFR \ 1 STORY