Notes:
1. SIDING ON GABLES AND AREA BOX-OUTS ARE NOT PERMITTED.
2. MASONRY MUST BE INSTALLED UNDER ANY BOX-OUT ON THE 1st FLOOR.(4/8/2004 11:43 VI)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
13. BEAMS=10"W X 32"D.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
2-#5 REBAR IN BOTTOM OF ALL BEAMS.
1692 AC, 2249 SQ FT, SFR \ 1 STORY