Notes:
4821 AC, 5686 SQ FT, SFR / 2 STORY
7/1/2004 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
48. SLOPED CEILING INSULATION R-22 (OR) AS SPECIFIED ON THE ENERGY STAR SUMMARY REPORT.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(07/01/2004 15:54 JC)Grade Beams: (2) #4 rebar in the bottom of all beams that do not contain beam strands.