Notes:
2209 AC, 2944 SQ FT, SFR / 2 STORY
8/1/2004 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
11. BEAMS=10"W X 29"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
38. 1 HOUR FIRE WALL ASSEMBLY REQ'D - SUBMIT DESIGN PRIOR TO WALL CONSTRUCTION.
40. ON "0" SET-BACK SIDE OF HOUSE NO METERS OR VENTS ARE ALLOWED. GUTTER DOWNSPOUTS MUST DISCHARGE ONTO SAME PROPERTY 5'-0" FROM FOUNDATION.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
* 2ND FLOOR W/ 2 BRS, 1 BATH, GAME ROOM, MEDIA ROOM, AND COVERED BALCONY