Notes:
1793 AC, 2390 SQ FT, SFR / 1 STORY
10/14/2004 12:00:00 AM
arking pad encroachment and partial Rem-rate report.(11/06/2004 12:50 JC)
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
7. BEAMS=8"W X 30"D.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
48. SLOPED CEILING INSULATION R-22 (OR) AS SPECIFIED ON THE ENERGY STAR SUMMARY REPORT.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.(10/14/2004 14:24 JC)Parking pad encroachment and partial Rem-rate report.