Notes:
4179 AC, 4648 SQ FT, SFR / 2 STORY
11/14/2004 12:00:00 AM
1. ***ENERGY STAR***
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
8. BEAMS=10"W X 24"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
* 2ND FLOOR W/ 2 BR'S, 2 BATHS, GAME ROOM AND MEDIA ROOM AND FINISHED ATTIC ( 2ND LEVEL, 1 PLUG, 1 LIGHT, NO A/C, DO NOT FINISH WALLS OR RESUBMIT FOR A/C SPACE - 150 SQ FT).
* NEED WATER, GAS, ELECTRIC, AND SEWER ON ALL PLOT PLANS.
* ACCESS PANELS TO JACUZZI TUB.