Notes:
1- CONTINGENT UPON COMPLIANCE WITH P+Z & CIVIL ENGG APPROVALS OF FINAL SITE PLAN, BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- DESIGN & SITE LOCATION OF DUMPSTER ENCLOSURE FACILITY TO CONFORM WITH STANDARD CITY CRITERIA. SYSTEM MUST BE ACCEPTED BY THE ENVIRONM'L SVCS DEPT. (972-335-5519) PRIOR STARTING ANY CONSTRUCTION. SUBMIT FINAL REVISION FOR APPROVAL.
3- NO MECH'L ITEM OR EQUIPMENT TO BE SHOWING ON ROOF EXCEPT FOR INCONSPICUOUS VENTS OR FLUES WHEN APPROVED BY INSPECTOR AND PAINTED TO MATCH ROOF COLOR.
4- UNLESS OTHERWISE PERMITTED BY INSPECTORS AND EXCEPT FOR THE DRIVE-THRU CANOPY ONLY, ALL RAIN DOWNSPOUTS TO BE CONNECTED TO UNDERGROUND STORM DISCHARGE SYSTEM.
5- DRIVE-THRU CANOPY STRUCTURE TO BE CONSTRUCTED WITH NON-COMBUSTIBLE MATERIALS. WOOD TRUSSES MUST BE PROTECTED WITH EFFECTIVE 1 HR FIRE-REATED CLG AS REQ'D.
6- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
5363 SQ FT, CNEW / TEXANS CREDIT UNION