Notes:
1- CONTINGENT UPON COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- STRUCT'L ENGR'S "SAWCUTTING" DETAIL (OF HOW TO CUT OUT NEW WINDOW OPENINGS) IS MISSING THE NECESSARY INFORMATION WHETHER ADDITIONAL STRUCT'L REINFORCING IS TO BE PROVIDED OR NOT. STRUCT'L REINF'G OF THE ALTERED TILT-UP PANELS IS REQ'D TO BE DETAILED BY THE STRUCT'L ENGR FOR ALL OPNGS EXCEPT FOR THOSE OPNGS SPECIFICALLY IDENTIFIED BY THE ENGR NOT IN NEED OF ANY REINF'G. (NEW OPNGS ARE NOT ALLOWED UNLESS THE REQ'D INFO. IS SUBMITTED & APPROVED).
3- COMPUTER/ ELECT'L ROOM TO HAVE 1 HR WALLS TO DECK (OR TO 1 HR CLG) WITH 45-MINUTE DOOR (IN 1 HR FRAME) SWINGING OUTWARD. WALL RECESSES FOR THE ELECT'L PANELS MUST BE 1 HR.
4- SEPARATE STORAGE ROOM 115 FROM OPEN EXITWAY OF ROOF LADDER AREA AS REQ'D.
5- PROVIDE HI/LO (DUAL SPOUT LEVELS) DRINKING FOUNTAIN AS REQ'D.
6- TOILET DOORS TO SWING OUT AS PER COMMENTS.
7- STOREFRONT GLAZING NEXT TO NEW EXIT DOOR & DOOR TO BE TEMPERED GLASS TO MATCH BLDG'S STOREFRONT SYSTEM.
8- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
3658 SQ FT, CIFO / MANAGEMENT OFFICE (new plan)