Notes:
1- CONTINGENT UPON P+Z & CIVIL ENGG APPROVALS OF FINAL SITE PLAN, BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- SUBMIT ARCH'L & SRUCT'L DETAILS FOR SINGLE DUMPSTER ENCLOSURE AS PER CITY CRITERIA. SYSTEM & LOCATION MUST BE ACCEPTED BY THE ENVIRONMENTAL SVCS DEPT (972-335-5519) & APPROVED PRIOR STARTING ANY CONSTRUCTION.
3- WALLS & CLG OF BANK'S TRASH SERVICE ROOM TO BE 1 HR (INTERIOR DOOR TO BE 45 MINUTE IN 1 HR FRAME) AND ROOM MUST HAVE AUTOMATIC FIRE SPRINKLER PROTECTION.
4- ELECTRIC CLOSET TO BE 1 HR RATED (WALLS & CLG) WITH 45 MINUTE DOORS IN 1 HR FRAME.
5- ATTACHED CANOPY WITH SEPARATING WALL TO BE 1 HR FIRE RATED CONSTRUCTION. (WITH THE UNDERSIDE OF CANOPY PROTECTED WITH 1 HR PORTLANDCEMENT PLASTER CLG.
6- THE SUGGESTED PITCHED ROOF OR MANSARD ROOF BAND OVER CANOPY FASCIA, TO HARMONIZE ARCHITECTURALLY WITH BLDG'S MAIN ROOF, IS OPTIONAL. ALSO OPTIONAL IS THE SUGGESTED FLARED-OUT CANOPY END AGAINST OFFICE BLDG FOR ARCHITECTURALLY COVERING THE ENTIRE TELLER WINDOW (REVISED DTLS MUST BE FILED IN CASE OF ANY FOLLOW-UP MODIFICATION).
7- NO MECH'L ITEM OR EQUIPMENT TO BE VISIBLE ON ROOF OTHER THAN INCONSPICUOUS SMALL VENTS OR FLUES WHEN APPROVED BY INSPECTORS AND PAINTED TO MATCH ROOF COLOR.
8- STRUCTURAL FOUNDATIONS MUST FOLLOW RECOMMENDATIONS OF THE GEOTECHNICAL ENGR'S SOIL REPORT INCLUDING SPECIFIC BLDG PAD PREPARATION INSTRUCTIONS & MOISTURE CARE NECESSARY FOR MONOLITHIC SLAB-ON-GRADE FOUNDATION AS PER GEOTECH'L ENGR DANIEL FRANKLIN'S LETTER TO STRUCT'L ENGR LARRY WU (SUBMITTED ON 7-5-05).
9- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
(9/23/2005 12:05 SEL) *** M, E, P PERMITS ARE HOLDING UNTIL GC NAMES CONTRACTORS. MEP'S NEED TO HAVE A CURRENT REGISTRATION BEFORE MEP PERMITS ARE RELEASED.
5620 SQ FT, CNEW / CHASE BANK