Notes:
3110 SQ FT, CIFO / LEVEL UP
8/3/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck.
3. tempered windows 2' of doors
4. 20 minute door--interior doors
5. 45 minute doors at one hour corridor.
6. one hour corridor
7. Need high/low drinking fountain---18" from any door, 18" from any hallway entry.
8. fully sprinklered.