Notes:
5013 SQ FT, CIFO / AVATAR
8/20/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck & fire caulked.
3. 45 minute door @ sprinkler riser room.
4. fireproof any wall penetrations.
5. fully sprinklered.