Notes:
1385 SQ FT, CIFO / BRYTAR SPEC SPACE
10/13/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck and fire seal floor to deck.
3. install mop sink.
4. fully sprinklered.
5. subject to field inspection approval.