Notes:
7000 SQ FT, CIFO / T-MOBILE DATA CENTER
11/15/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour wall at UPS, with 45 min. door & 1 hr. frame.
3. spoke with Michael Walker (planner) he approved parking due to generator pad change.
4. existing doors to remain.
5. fully sprinklered.
6. maintain existing doors in 1 hr. corridor.
7. maintain 1 hr. corridor separation.
8. 1 hr. fire/smoke connection at rated walls.