Notes:
1200 SQ FT, CIFO / SALON RIZOS
11/11/2005 12:00:00 AM
1. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire caulk all joints floor to ceiling.
2. option--- if wood studs are used in construction they must be fire treated.
3. Need high/low drinking fountain, location is optional as long as ADA compliant.
4. tempered windows and door.
5. add exit sign (lights)
6. fully sprinklered