Notes:
2974 AC, 3411 SF, SFR / 2 STORY
11/29/2005 12:00:00 AM
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
09. BEAMS=10"W X 26"D.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
56. LETTERS OF ACCEPTANCE REQUIRED FROM BOTH ENGINEERS FOR CO.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.