Notes:
2860 SQ FT, CIFO / SPEC SPACE #501
12/30/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
3. 20 minute door at entry and maintain one hour corridor.
4. fully sprinklered.
5. kitchen cannot be an emergency egress----due to dead end corridor these doors cannot have any locksets installed. in addition, install fire extinguisher top of this dead end corridor.
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
REFER TO APPROVED PLANS FOR NOTES.
SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
CALL 972-335-5586 TO REQUEST INSPECTIONS.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.