Notes:
5125 AC, 6258 SF, SFR / 2 STORY
2/2/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
2 - #4'S IN THE BOTTOM OF ALL BEAMS WITHOUT BEAM STRANDS
26. TEMPERED GLASS REQ'D AT MASTER BATH TUB WINDOW
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
2ND FLOOR: 3 BEDROOMS, 3 BATH, MEDIA, GAME ROOM AND LOFT.