Notes:
97000 SQ FT, CIFO / T-MOBILE OFFICES
2/4/2006 12:00:00 AM
1. 20 minute doors at 1 hr. corridor where entering office suites.
2. 1 hour door at shaft enclosures.
3. see prints for notes on reconfiguration of 1 hr. corridor and where new 60 min. doors are req'd.
4. reception--rm. # 1100 wall assembly to deck, or install 60 min. door instead of herculite door.
5. reception --rm. # 1100 provide sprinklers at entry to this area due to frameless herculite doors.
6. employee lounge---provide minimum 32" egress in aisles for wheelchair accessibility.
7. fire/smoke dampers to be provided as per detail.
8. fully sprinkled.
9. construction subject to field app'd. inspection.
1. PANELS ARE OVERLOADED
2. SUB PANELS---THERE ARE SOME BREAKERS FEEDING SUB-PANELS
THAT ARE UNDERRATED
3. WITH CALCULATIONS SHOWN ON PRINT IF SPARES ARE USED IN THE FUTURE, THERE IS RISK OF OVERLOADING THE PANEL.
4. ENSURE CORRECT CONDUIT SIZING FOR CONDUCTORS PER NEC. SHEET E5.01, E5.02
NEED TO RE-CALCULATE LOADS.
add plug at corridor bldg. b ckt. L2C-83
sheet E3.01 ADD EXIT LIGHTING IBC 2000 1003.2.10.1
CALLED GREG BURK AND EXPLAINED ISSUES.
he stated updated dwgs. will be sent to us
I talked to Steve Covington and we will issue permit without approving electrical. I also talked to Jeff Blake and made him aware of this issue. I will insert revised dwgs. with office copy and
Greg Burk will ensure that revised dwgs. will be sent to the field, and I will give an additional copy to Jeff Blake making sure everyone is on the same page.