Notes:
4534 AC, 5686 SF, SFR / 2 STORY
8/9/2006 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
36. REM-RATE REPORT MUST INCLUDE OUTSIDE FRESH AIR REQUIREMENT.
37. DRIVEWAY SLOPE MUST NOT EXCEED 12% - PLOT PLANS W/GRADES REQUIRED.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
55. FUEL BURNING HOT WATER HEATER INSTALLATION MUST BE CODE COMPLIANT.
(8/9/2006 13:38 PPB)
SPECIAL CONDITIONS;
1. Provisions in 2003 IRC section E3802 shall be complied (electrical plans doesn't show compliance with this section).
2. Receptacle power outlet required at stair landing (see E3801.2.2 #1).
3. Dropped garage slab specify in architectural floor plan shall comply with the engineered foundation plan. Foundation plan and detail specify a 12" maximum dropped is allowed.
4. Field cut ends, notches, and drilled holes of pressure preservatively treated wood shall be retreated in the field.