Notes:
500 SQ FT, SADD / WINE CELLAR W/BATH & ELEVATOR
9/25/2006 12:00:00 AM
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
18. BEAMS=12"W X 30"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
60. BUILDER CAUTION: CONSTRUCTION NOT CONFORMING TO THE ABOVE PERMIT REQUIRMENTS COULD RESULT IN C.O. DELAY OR POSSIBLE DENIAL.
vapor retarder required at basement exterior wall buried below grade per IRC requirements.
use waterproofing agent @ all joints @ interior walls in basement
treated lumber shall be used for wall framing
drains req'd. in basement (3) per Geotech Engineer's report.
R-13 insulation at wall per IRC N1102
9-12-07 JM
1. WORKING IN CONJUNCTION WITH BUILDING INSPECTOR JAMES SHELTON AND BUILDER SAM CHAPMAN ALONG WITH SUPERINTENDANT JEFF SANTEE.
2. PWDR. BATH AND ELEVATOR ADDED TO WINE CELLAR, COMPLETE REVISED DWGS. FILED IN AUGUST BIN. CD SCANNED TO TRAK-IT.
3. NEED SPEC SHEET ON ELEVATOR FROM MANUFACTURER.
4. CONDITION MECH. ROOM (VENTILATION REQ'D.)
5. CARBON FILTERED EXHAUST FAN REQ'D. AT PWDR. BATH OR EXHAUST TO EXTERIOR--PER STEVE COVINGTON
6. FRAMING ISSUES WILL BE ADDRESSED AND SUBJECT TO FIELD INSPECTION APPROVAL.
7. ELECTRICAL---NEW 600 AMP SERVICE REQ'D. FOR HOME WHICH IS
A 400 AMP SERVICE PRESENTLY WITH A 320 AMP METER.
WITH THE ADDITION OF 200 SUB-PANEL FOR WINE CELLAR
THIS REQUIRES A 600 AMP METER WITH CT'S AND RATED METER CAN.