Notes:
2080 AC, 2590 SF, SFR / 1 STORY
12/11/2006 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
30. 1ST FLOOR WINDOW BOX-OUTS MUST HAVE MASONRY BELOW.
35. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
42. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. WINDOW BOX-OUTS MUST NOT EXCEED TWICE THE WINDOW M.O. AREA.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(12/11/2006 08:33 JC)
Sideyard patio - (if) covered, must not encroach into sideyard set-back. 100% masonry option req'd.