Notes:
4907 AC, 5904 SF, SFR / 2 STORY
3/5/2007 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
60. BUILDER CAUTION: CONSTRUCTION NOT CONFORMING TO THE ABOVE PERMIT REQUIRMENTS COULD RESULT IN C.O. DELAY OR DENIAL.
storage rm. @ 2nd level is approved a/c area
2nd level: 3 bdrm. 2 ba. game & media
no 2nd flr. deck and/or opt. 5 bd. & ba. are approved this permit