Notes:
5211 AC, 5996 SF, SFR / 2 STORY
3/23/2007 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 32"D.
20. W/12" DIA. PIERS belled to 36" W/(2) #9 REBAR.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
33. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
60. BUILDER CAUTION: CONSTRUCTION NOT CONFORMING TO THE ABOVE PERMIT REQUIRMENTS COULD RESULT IN C.O. DELAY OR POSSIBLE DENIAL.
retaining wall must be engineered when the heighth is at 3' or higher
temp. pavement easement to be removed, see plat.--this was set in as a turnaround lane for fire engines and to be removed when through is complete.
2nd level: 3 bdrm. 2 ba. game & media. Provide handrails at retaining wall steps if (3) risers (or) more.
2nd level: 3 bdrm. 2 ba. game & media.