Notes:
2617 SQ FT, CIFO / UNITED TITLE
11/20/2007 12:00:00 AM
A- CONTINGENT UPON COMPLIANCE WITH P+Z & CIVIL ENGG APPROVALS OF SITE PLAN, BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
B- DUMPSTER ENCLOSURE AREAS TO COMPLY WITH CITY CRITERIA'S STANDARD DETAILS AND ALL SYSTEM TO BE APPROVED BY THE ENVIRONM'L DEPT PRIOR STARTING ANY CONSTRUCTION.
C- ALL PARTS OF THE BLDG ENVELOPE MUST MATCH OR EXCEED THE MIN. INSULATION REQUIREMENTS OF IECC, WITH R-11 FOR WALLS, R-20 FOR ROOF.
D- STOREFRONT GLAZING TO BE 1" INSULATED GLASS TO PROVIDE MAX. SHGC=0.6 AND MAX. U=0.7. (MUST CONFORM WITH SAFETY GLASS REGULATIONS. ALSO ANY FUTURE RATED WALL ENDING AT THE STOREFRONT MUST PROVIDE 1 HR FIRE/SMOKE CONNECTION TO THE NEAREST MULLION OR PILASTER).
E- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
1. Tempered windows/glass where req'd.
2. Fully sprinkled II-B construction.
3. All work subject to field approved inspections and testing.
4. 1 hr. demising walls UL-U465, fire caulk floor to underside of roof deck.
5. Interior finishes: Group B, Class C flame spread 76--200
smoke developed 0--450.
6. See article 110 of NEC 99 for clearances about electrical panels.