Notes:
11:00 JM
1. IF------ EXISTING TUB IS A SPA TUB, ENSURE THAT SPA GROUND TO COLD WATER IS MAINTAINED BEFORE CONSTRUCTION IS COMPLETE. INSPECTOR WILL NEED TO INSPECT THE INTEGRITY OF THE SPA GROUND IF PRESENT.
2. GFCI OUTLET SPACING PER NEC 1999 ARTICLE 210.8 (A) 1.
3. ALL WORK SUBJECT TO FIELD APPROVED INSPECTIONS.
4. MAINTAIN 2X6 WET WALLS AT PLBG. LINES.
SALT / MASTERBATH REMODEL