Notes:
AC 520 SQ FT, SADD / 2ND STORY ADDITION
5/16/2008 12:00:00 AM
02. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
31. SIDING DIRECTLY OVER MASONRY AT SECOND STORY IS NOT ALLOWED.
33. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
2ND LEVEL: GAME ROOM