Notes:
3260 AC, 4060 SF, SFR / 2 STORY
8/28/2008 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
42. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN.
49. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
50. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
60. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
(8/28/2008 13:29 JC) Grade Beams : 8" w. x 31" d.
All future builder plan submittals must be on 24" x 36" sheets.
All future E.O.R. plans must include foundation details (sheet) in both the CD and paper portion of the submittal.
(12/3/2009 07:50 MAC) PERMIT RE-ISSUED. CONTRACTOR NAME CHANGED WITH WRITTEN AGREEMENT THAT ALL REMAINING INSPECTION(S) WILL BE COMPLETED INCLUDING ALL OUTSTANDING OR PREVIOUSLY FAILED INSPECTIONS, AND OF ACCEPTANCE OF ALL WORK COMPLETED TO DATE AND THAT ALL WORK FORWARD WILL BE IN COMPLIANCE WITH CITY CODES AND ORDINANCES.
(1/13/2010 9:37 AM MAC) PERMIT RE-ISSUED. CONTRACTOR NAME CHANGED WITH WRITTEN AGREEMENT THAT ALL REMAINING INSPECTION(S) WILL BE COMPLETED INCLUDING ALL OUTSTANDING OR PREVIOUSLY FAILED INSPECTIONS, AND OF ACCEPTANCE OF ALL WORK COMPLETED TO DATE AND THAT ALL WORK FORWARD WILL BE IN COMPLIANCE WITH CITY CODES AND ORDINANCES.