Notes:
1. ALL WORK SUBJECT TO 2006 IPC, 2006 IRC, 2005 NEC CODES.
2. ALL CONSTRUCTION SUBJECT TO FIELD APPROVED INSPECTIONS AND TESTING.
3. SPA MOTOR AND COLD WATER BONDING SHALL BE ACCESSIBLE WITH DOORS FOR INSPECTION AND FOR MAINTENANCE PURPOSES.
4. 2X6 WALLS REQ'D. AT PLBG.
5. PLANS TO REMAIN ON SITE THROUGHOUT CONSTRUCTION.
6. BACK OF TUB MUST MEET 2006 IECC ENVELOPE REQ'MENTS (6 SIDED THERMAL BYPASS PROTECTION).
INSPECTIONS REQ'D.
A. PLBG. ROUGH/ELECT. ROUGH
B. MISC. FRAME
C. ELECT. FINAL/PLBG. FINAL/MISC. BLDG. FINAL
SALT / BATHROOM REMODEL