Notes:
THESE REQ'MENTS WILL BE FIELD VERIFIED.
the new restroom (2 are req'd). must have a clearance at the water closet of 60" wide x 56" deep ANSI A117.1
EXISTING TACO SHOP/NEW OWNER
ICC A117.1 RESTROOM ACCESSIBILITY CLEARANCE SHALL BE 60" X 56" VOID OF ANY ENCROACHMENT IN THE SPACE OF THE W/C {RESTROOM SPACES MUST MEET CURRENT ADA AND TAS & ICC A117}.
A. CONTINGENT UPON COMPLIANCE WITH BLDG CODES & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
B. ALL PARTS OF THE BLDG ENVELOPE MUST MATCH OR EXCEED THE MIN. INSULATION REQUIREMENTS OF IECC, WITH R-13 FOR WALLS, R-19 FOR ROOF.
C. SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
D. TEMPERED WINDOWS/GLASS WHERE APPLICABLE.
F. INTERIOR FINISHES: GROUP-A2 CLASS--B
FLAME SPREAD ------------ 25 TO 76
SMOKE DEVELOPED------- 0 TO 450
H. ANY DUCT PENETRATIONS THRU DEMISING WALLS SHALL HAVE FIRE/SMOKE DAMPERS INSTALLED-EXPANDING CAULK PROHIBITED.
I. ALL WOOD BLOCKING SUPPORTING MILLWORK, STANDARDS & EQUIPMENT SHALL BE (FRT) FIRE TREATED WOOD.
J. WHERE ABOVE CEILING AREA IS USED AS HVAC PLENUM-ALL WIRING SHALL BE PLENUM RATED.
L. MILLWORK TO MEET ADA/TAS REQUIREMENTS.
MOP SINK REQ'D.
MECHANICAL IS EXISTING NO CHANGES
(3/26/2009 16:48 MBW)
REFERENCE APPROVED REDLINES PLANS AND PLAN REVIEW HISTORY DOCUMENT FOR ANY & ALL PLAN REVIEW COMMENTS.
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
ALL WORK PERFORMED MUST MEET THE 2006 IBC STANDARDS, LOCAL AMENDMENTS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES.
SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
CALL (972) 292-5386 FOR INSPECTION.
1056 SQ FT, CIFO / MARIANAS TACO SHOP