Notes:
576 SQ FT, COMM / BEAVERS BEND PARK PAVILLION
5/29/2009 12:00:00 AM
1. PER ATTACHED DOCUMENT: AWNING FABRIC SHALL BE FIRE-RETARDENT. (THIS IS FILED WITH THE City of Frisco)
2. SUBJECT TO FIELD APPROVED INSPECTIONS AND TESTING.
3. PIER INSPECTION IS REQ'D.
4. CONSTRUCTION SHALL COMPLY WITH MANUFACTURERS INSTRUCTIONS AND WITH IBC 2006 CHAPTER 16 AND SECTION 31. 1607.11.2.4 AWNINGS AND CANOPIES SHALL BE DESIGNED FOR A UNIFORM LOAD OF 5 PSF ROOF LOAD MINIMUM.
5. WIND DESIGN LOAD CATEGORY: 90 MPH 3 SEC. GUST, SEISMIC DESIGN CATEGORY B. EXPOSURE C. SECTION 1609 WIND LOADS
(LATERAL FORCES) NOT LESS THAN 10 PSF.
(5/29/2009 18:06 MBW)
REFERENCE APPROVED REDLINES PLANS AND PLAN REVIEW HISTORY DOCUMENT FOR ANY & ALL PLAN REVIEW COMMENTS.
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
ALL WORK PERFORMED MUST MEET THE 2006 IBC STANDARDS, LOCAL AMENDMENTS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES.
SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
CALL (972) 292-5386 FOR INSPECTION.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
***ISSUANCE OF BUILDING PERMIT DOES NOT INCLUDE FIRE MARSHALL APPROVAL. SEPARATE SUBMITTAL FOR FIRE MARSHALL REVIEW, FIRE SPRINKLER, FIRE ALARM, FIRE UNDERGROUND, AND /OR ANY ADDITIONAL REUIREMENTS AS SET FORTH BY THE FIRE MARSHALL NEED TO BE SUBMITTED DIRECTLY TO THE FIRE MARSHALL OFFICE FOR APPROVAL.***