Notes:
SALT / INSTALL 2.4 KW WIND TURBINE
10/8/2009 12:00:00 AM
3108.2 Location and access. The Wind Turbine Tower shall be located and equipped to provide ready access for inspection purposes. Guy wires or other accessories shall not cross or encroach upon any street or other public space, or over above-ground electric utility lines, or encroach upon any privately owned property without written consent of the owner of the encroached-upon property, space or above-ground electric utility lines.
3108.3 Construction. The Wind Turbine Tower shall be constructed of approved corrosion-resistant noncombustible material.
3108.4 Loads. The Wind Turbine Tower shall be designed to resist wind loads in accordance with TIA/EIA-222.
3108.4.1 Dead load. Tower shall be designed for the dead load plus the ice load in regions where ice formation occurs. (5psf)
3108.4.2 Wind load. Adequate foundations and anchorage shall be provided to resist two times the calculated wind load. (180mph 3-sec gust or 152mph fastest-mile wind speed.)
3108.5 Grounding. The Tower shall be permanently and effectively grounded.