Notes:
150 SQ FT, SALT / DRIVEWAY EXTENSION
11/5/2009 12:00:00 AM
1. ALL WORK SHALL BE FIELD APPROVED BY CITY INSPECTOR.
2. EXPANSION JOINT REQ'D. BETWEEN EXISTING AND NEW POUR.
3. # 3 REBAR SPACED 18" O.C.E.W. [ON CENTER EACH WAY] AND CHAIRED.
4. WHERE SAND IS USED FOR FILL, ONLY 1" MAXIMUM.
5. #3 REBAR TO BE USED AT ALL TIE--INS FROM NEW TO OLD CONCRETE WITH EXPANSION JOINTS.
6. MAXIMUM 32' WIDTH AT LOWER PORTION OF DRIVEWAY FOR REAR ENTRY. CANNOT EXCEED THIS WIDTH. THIS IS THE AREA THAT IS 4' TO 5' IN DEPTH THAT IS TYPICALLY CITY RIGHT OF WAY.
7. NO VERTICAL STRUCTURES SHOWN AND NO VERTICAL STRUCTURES PERMITTED.
8. NO ELECTRICAL OR MECHANICAL IN SCOPE OF WORK.