Notes:
DEMO WALL TO RELOCATE WATER HEATER
11/20/2009 12:00:00 AM
1. SUBJECT TO FIELD INSPECTION. ALL WORK SHALL COMPLY WITH CURRENT I-CDES.
2. RELOCATE W'HTR.
3. CUT HOLE IN INTERIOR NON-LOAD BEARING METAL STUD WALL TO ACCESS BREAK ROOM AND RELOCATE WATER HEATER AWAY FROM ELECTRICAL PANELS. PRESENT WATER HEATER LOCATION IS IN VIOLATION OF CLEARANCE REQ'MENTS UNDER XFMR. & ELECTRICAL PANELS.
4. TOM WHEELER IS AWARE OF THIS ALTERATION AND HE SHOULD BE THE INSPECTOR TO APPROVE CONSTRUCTION.