Notes:
1. ALL WORK SHALL COMPLY WITH CHAPTER 10 OF THE 2006 IRC.
2. THE 2 & 10 RULE WILL APPLY FOR CHIMNEY.
3. ALL WORK SHALL BE FIELD APPROVED [INSPECTED BY CITY INSPECTOR].
4. ONE STORY CEILING HEIGHT W/ STICK FRAME METAL INSERT F/P; SYNTHETIC STONE TO BE PLACED ON FACE OF STICK FRAME.
5. ANY PENETRATIONS THRU WALL/ CEILING SHALL BE SEALED.
6. GAS LINE TO F/P REQUIRES A PLBG. TOP OUT INSPECTION [PRESSURE TEST IS ALSO RQ'D].
7. CHIMNEY EXTERIOR FACADE MATERIAL SHALL BE HARDI-SIDING ONLY.
8. MUST MEET ALL CLEARANCE REQ'MENTS TO COMBUSTIBLES, PER MANUFACTURERS INSTRUCTIONS AND CHAPTER 10 OF THE 2006 IRC.
9. OUTSIDE COMBUSTION RATE MUST MEET 2006 IMC.
INSPECTIONS REQ'D. BUT NOT LIMITED TO:
PLBG. ROUGH
PLBG. TOP-OUT
ELECTRICAL ROUGH IF APPLICABLE
MISC. FRAME
PLBG. FINAL/ELECT. FINAL
MISC. FINAL
SOME OF THESE INSPECTIONS CAN BE COMBINED, THIS WILL HAVE TO BE COMMUNICATED BETWEEN HOMEOWNER AND CITY INSPECTOR AND WILL BE AT THE DISCRETION OF THE INSPECTOR.
10 SQ FT, SALT / ADD FIREPLACE W/BOOKSHELVES