Notes:
16 SQ FT OUTDOOR KITCHEN / SALT
7/6/2010 12:00:00 AM
1. GAS GRILL/OUTDOOR KITCHEN TO BE INSTALLED.
2. NO PLBG. IN SCOPE OF WORK; HOWEVER PER CONVERSATION WITH CONTRACTOR THERE WILL BE A HARD PIPE STUB OUT FROM EXISTING GAS LINE AT THE BACK WALL OF THE HOUSE. THERE MUST BE A VALVE HERE AND A VALVE AT THE APPLIANCE.
3. MAXIMUM OF 3' FLEX LINE MAY BE USED. ONCE AGAIN THERE MUST BE A VALVE AT THE APPLIANCE.
4. NO ROOFED STRUCTURE OVER GRILL HAS BEEN REVIEWED OR APPROVED.
5. INSPECTIONS REQ'D.
ELECT. ROUGH
BRICK--------------COMPLETE FULL CMU INSTALLATION. CALL FOR INSPECTION
MISC. FINAL
5. CITY APPROVED STAMPED PLANS MUST REMAIN ON SITE.
6. ALL WORK MUST CONFORM TO LOCAL AMENDMENTS AND ADOPTED CODES.
7. NO PORTION OF THIS OUTDOOR KITCHEN MAY ENCROACH OVER THE REAR BUILD LINE.