Notes:
64 SQFT / SADD ABOVE GROUND WATER TANK
3/9/2011 12:00:00 AM
1. MAKE-UP WATER SHALL BE PROVIDED WITH A RPBA LOCATED ABOVE GRADE IN A WEATHER RESISTIVE INSULATED ENCLOSURE. TERMINATION TO AT TANK SHALL BE MADE BY MEANS OF A PHYSICAL AIR GAP 2” ABOVE THE FLOOD LEVEL RIM OF TANK.
2. NO ELECTRICAL PERMIT ISSUED AS A PORTION OF THIS PERMIT.
3. ALL PLUMBING SCOPE OF WORK SHALL BE COMPLETED BY A REGISTERED PLUMBING CONTRACTOR.
4. PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
5. SUBDIVISION HOA APPROVED MAY BE REQUIRED.
6. PLANS PROVIDE LIMITED INFORMATION ABOUT INSTALLATION METHODS AND DESIGN FOR PLUMBING SCOPE. PERMIT SHALL BE SUBJECT IN WHOLE TO FIELD INSPECTION AND APPROVAL. PERMIT APPROVAL DOES NOT IMPLY APPROVAL OF INSTALLATION METHODS AND DESIGN BASED ON LIMITED INFORMATION PROVIDED.
*** ALL PORTIONS OF RAINWATER HARVESTING SYSTEM SHALL MEET THE BEST PRACTICES OF THE TEXAS MANUAL ON RAIN WATER HARVESTING PUBLISHED BY THE WATER DEVELOPMENT BOARD.