Notes:
6000 SQ FT, CIFO / WORLD LINK TAC NOC
6/21/2011 12:00:00 AM
IBC
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS. REFERENCE APPROVED REDLINES PLANS AND PLAN REVIEW HISTORY DOCUMENT FOR ANY & ALL PLAN REVIEW COMMENTS.
ALL WORK PERFORMED MUST MEET THE 2006 IBC, IMC, IPC, IECC, IFC & 2005 NEC STANDARDS, ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES AND LOCAL AMENDMENTS .
SUBJECT TO M.E.P. & FIRE MARSHAL REVIEWS AND FIELD INSPECTIONS. CALL (972) 292-5386 FOR INSPECTION.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
***ISSUANCE OF BUILDING PERMIT DOES NOT INCLUDE FIRE MARSHAL APPROVAL. SEPARATE SUBMITTAL FOR FIRE MARSHAL REVIEW, FIRE SPRINKLER, FIRE ALARM, FIRE UNDERGROUND, AND /OR ANY ADDITIONAL REQUIREMENTS AS SET FORTH BY THE FIRE DEPARTMENT NEED TO BE SUBMITTED DIRECTLY TO THE FIRE MARSHAL OFFICE FOR APPROVAL.***
REVISED MECH PLAN APPROVED BY CSW 7/8/11
(7/8/2011 1:06 PM CSW) REVISED AS NOTED:
MECHANICAL INSPECTOR REQUEST TO ADD NOTES TO MECHANICAL PLAN. NOTE # 1 TO READ: PROVIDE R-30 INSULATION AT BOTTOM CHORD OF ROOF TRUSSES. HOLD INSULATION IN PLACE BETWEEN JOISTS WITH WOVEN WIRE ATTACHED TO BOTTOM CHORD. COVER ALL SPRINKLER PIPING WITH INSULATION. INSTALL TYVEK BELOW WOVEN WIRE, TAPE AND SEAL ALL JOINTS AND OPENING IN TYVEK. HOLD IN PLACE AS REQUIRED.
(7/18/2011 1:14 PM MBW)
UPDATED GENERAL, MECHANICAL, AND PLUMBING CONTRACTORS.
(7/19/2011 8:26 AM CSW)
Architect provided detail drawing of one hour wall detail at joist and ceiling access point-plan to mechanical.
(7/20/2011 10:57 AM MBW)
GC, MECH, ELECT, AND PLUMB CONTRACTORS UPDATED BY STUDIO REDDOT.
(8/10/2011 10:25 AM MBW)
REVISED ELECTRICAL PLANS APPROVED BY JDSM.