Notes:
180 SQ FT, SADD / ENCLOSE PATIO
4/3/2014 12:00:00 AM
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
132. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE.
150. ALL FACADES (EXTERIOR) MATERIALS MUST REFLECT EARLY 20TH CENTURY TEXAS ARCHITECTURAL STYLES SAME AS THE EXISTING STRUCTURE.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
193. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
ENGINEERED WOOD SIDING OR HARDI PLANK SIDING WILL MEET THE MASONARY REQUIRMENT.