Notes:
1600 SQ FT, SALT / ADD APPROACH
6/3/2014 12:00:00 AM
112. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
115. * 5' TURNING RADIUS REQUIRED AT THE APPROACH.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
(6/5/2014 9:25 AM SLC)
CIRCULAR DRIVE APPROVED BY ENGINEERING PENDING THE REMOVAL OF EXISTING APPROACH AND REPLACEMENT OF CURB SECTION. ADDITION OF RADIUS SECTIONS AT EXISTING DRIVE.