Notes:
336 SQ FT, SALT / INGROUND TRAMPOLINE
6/10/2014 12:00:00 AM
1. SUMP PUMP SHALL BE ON GFI BREAKER OR GFI PLUG.
2. PULL # 10 EQUIPMENT GROUND BACK TO PANEL FOR SUMP PUMP CKT.
3. BOND FRAME OF TRAMPOLINE BACK TO ORIGINAL GROUND ROD WITH # 8 SOLID COPPER CONDUCTOR WITH INDIVIDUAL CLAMPS AT EACH LOCATION.
5. ALL ELECTRICAL INSTALLATIONS SHALL COMPLY WITH NEC 2011
6. ALL WORK SUBJECT TO FIELD INSPECTIONS AND TESTING.
7. ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
8. PERMIT DOES NOT COVER ANY VERTICAL STRUCTURES. *
9. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
10. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.