Notes:
506 SQ FT, SALT / PATIO COVER
7/10/2014 12:00:00 AM
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
106. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
150. ALL FACADES (EXTERIOR) MATERIALS MUST REFLECT EARLY 20TH CENTURY TEXAS ARCHITECTURAL STYLES SAME AS THE EXISTING STRUCTURE.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
193. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
054. LETTERS OF ACCEPTANCE FOR ROOF FRAMING AND STRUCTURE REQUIRED FROM ENGINEER OF RECORDS PRIOR TO CITY OF FRISCO BUILDING INSPECTION OF 2NDS FRAME / STRUCTURE ADDITION.