Notes:
SALT / DRIVEWAY APPROACH ADDITION
9/3/2014 12:00:00 AM
112. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE.
115. * 5' TURNING RADIUS REQUIRED AT THE APPROACH.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
120. SUBJECT TO FIELD INSPECTION APPROVAL.
ADDITION OF NEW DRIVEWAY APPROACH