Notes:
801 SQ FT, SADD / ADD 4 ROOMS ABOVE GARAGE
1/23/2015 12:00:00 AM
ADD MEDIA ROOM, CRAFT ROOM, BEDROOM, BATHROOM AND WET BAR ABOVE GARAGE. WILL NEED ENGINEERED FLOORING SYSTEM AND ENGINEERS
LETTER OF ACCEPTANCE FOR FRAME REQUIRED FOR CERTIFICATE OF OCCUPANCY .
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
150. ALL FACADES (EXTERIOR) MATERIALS MUST REFLECT EARLY 20TH CENTURY TEXAS ARCHITECTURAL STYLES SAME AS THE EXISTING STRUCTURE.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
044. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2011 NEC AND 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVAL
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2012 IRC AND 2012 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.